Skip Navigation

West Virginia State Archives

GUIDE TO THE CAPITOL BLUEPRINT COLLECTION (AR1812)


Photograph Collection

The following is the guide to the Capitol Blueprint Collection (AR1812) as processed. The drawings have been broken into numbered series by building for ease in handling. The series are as follows:

Series I: Three Building Unit (Main Building and both wings)
Series II: Main Building
Series III: West Wing
Series IV: East Wing
Series V: Powerhouse
Series VI: Holly Grove
Series VII: Governor's Mansion
Series VIII: Motor Vehicles (now building 3)
Series IX: Office Building SE corner Washington & California (now building 4)
Series X: Office Building NW corner Washington & California (now buildings 5,6,7)
Series XI: Science and Culture Center
Series XII: Parking Building facing California (now building 2)
Series XIII: Miscellaneous - events, statuary, access roads (on Capitol Grounds)
Series XIV: Office Building, 2101 Washington St. E. (now building 17)
Series XV: Tax Department (formerly Coyle & Richardson (building 22)

Within each series, drawings have been grouped into subseries based on content:

100 Landscape/Foundation
200 Plot Plans
300 Elevations/Sections
400 Floor Plans
500 Roof Plans
600 Framing Plans
700 Electrical/Mechanical
800 Details/Schedules
900 Miscellaneous

Following this number is an alphabetical/numerical composite (e.g. W1, Y19, etc.) which serves as a location number. To the right of this is the drawing title. Specifications for some buildings and projects are in the Archives collection under AR1812.

rev. 4/3/1997


Series I: Three Building Unit

Landscape/Foundation
100 W1 Tree plot for main capitol grounds
100 W1 Property survey for capitol 6/23/1922
100 Z1 Site plan n.d.
100 Z1 Site plan 2/27/1929
100 Z1 Site plan n.d.
100 Y2 Plan showing location of borings
100 W1 Plan of grounds #104 3/12/1942
100 W1 Plan of grounds #101 rev. 4/22/1946
100 W1 Plan of grounds #102 rev. 6/30/1941
100 W1 Plan of grounds #101 10/7/1938
100 Y2 Part plan of grounds north of capitol
100 W1 Part plan of grounds north of capitol #105 4/22/1946
100 Y2 Part plan of grounds south of capitol
100 Y2 Ground detail between buildings 1-2
100 Y2 Capitol Circle - fountain & parking
100 Y2 Plan of pavements & walks
100 Y2 Plan of fountain
100 Y2 Fountain landscaping
100 Y2 Spur track
10 W1 Profile of Kanawha River 5/15/1929
100 W1 Profile of Kanawha River & bank 7/14/1922
100 Y2 Sloping bank cross section
100 Y2 Alterations to river from sidewalks, planting areas, paving plans & details
100 Z1 Site plan for town of Ruffner n.d.
100 W1 Planting areas along Kanawha Blvd. n.d.
100 Y2 Outside sidewalk, handicapped ramp & details #221-1 9/15/1971
100 Y2 Capitol Circle fountain & parking #U320-CIRCL-2-92 8/13/1979 (5 sheets)
100 Y2 River bank treatment in front of capitol #6-8 5/16/1939(4 sheets)
100 Y2 WV Veterans Memorial Plaza master plan 1988 (2 sheets)

Plot Plans
200 Y2 General plot plan showing building locations & rough grading
200 W1 General plot plan 3/1923
200 Z1 Plot plan sewer, water, gas & electric connections #500 10/25/1923
200 Y2 Plot plan sewer & electric connection
200 Y2 Sewer connection capitol
200 Y2 Plot plan water, gas & sewer connections #500A rev. 5/1926
200 Y2 Plot plan relation of tunnel to sewer
200 Y2 Plot plan of tunnel layout #500
200 Y2 Plot plan - city water line, Bldg. 3
200 Y2 Gas line replacement 8/1995

Floor Plans
400 Y2 Basement floor plan
400 Z1 Ground floor plan n.d.
400 W1 Ground floor plan DD 3/1923
400 W1 First floor plan 3/1927
400 Y2 First floor plan

Roof Plans
500 Z1 Detailed plans for roofing 9/20/1978

Series I continued

Roof Plans
500 Y2 Reroofing plans
500 Z1 Detailed plans for roofing 9/20/1978
500 Y2 Reroofing plans #464-1 1978 (6 sheets)

Electrical/Mechanical
700 W1 Basement electrical plans n.d.
700 Y1 High voltage modernization
700 Y1 Electrical service to Capitol Complex
700 Y1 Electrical modernization #241 (24 sheets)
700 Y1 Basement floor revised heating system
700 Y2 Revisions to chiller piping units A-B
700 Y2 New flood lighting #100-70
700 Y2 Wiring detail - computer addition, Capitol & Bldg. 3
700 Y2 Computer coaxial cable - conduit manhole road crossing
700 Y2 Drainage water supply & grounds lighting
700 Y1 Fire alarm system #287 1974 (30 sheets)
700 Z1 Refrigerated drinking water system #506 1/30/1930

Details & Schedules
800 W1 Exterior detail n.d.
800 W1 Exterior detail n.d.
800 W1 Typical exterior scaled details Bldgs. 1-2 #101 6/5/1923
800 W1 Typical exterior scaled details Bldgs. 1-2 #101 11/10/1923
800 Z1 Slab reinforcement 7/7/1980
800 Z1 Expansion joint detail 4/2/1931
800 Y1 Details of standard catch basin
800 Y1 Bldgs. 1 & 2 stair handrails to offices #69 1931

Miscellaneous
900 Z1 Directory n.d. (5 sheets)
900 Z1 Directory, Capitol n.d.
900 Z1 Directory of Capitol Complex 5/8/1941
900 Y1 Directory of offices
900 Y1 Directory of offices
900 Y1 Basement directory
900 W1 Space analysis proposed floors B-5 n.d. (6 sheets)
900 W1 Space analysis existing floors B-5 n.d. (12 sheets)
900 Y1 Plans for masonry restoration 1970
900 Y1 Preliminary major traffic circulation planning #65-1016 10/22/1965


Series II: Main Building


Landscape/Foundation
100 Y7 Part plan of grounds north of capitol basin, planting & walk area
100 Z3 Revised rough grading, south portico steps 12/9/1931
100 Z3 W. driveway - revision showing new location 8/26/1931
100 Z3 Foundation borings #000 n.d.
100 Z3 Foundation borings 12/12/1922
100 Y7 Foundation plan
100 W6 Foundation plan west #1000-01W n.d.
100 W6 Foundation plan east #1000-01E n.d.
100 Y7 Alternate foundation plan
100 Y7 Foundation walls

Series II continued

Landscape/Foundation
100 Z3 Additional piles 6/13/1930
100 Z3 Foundations - extra work 6/27/1930

Elevations and Sections
300 W6 North elevation n.d.
300 W6 North elevation #52 10/14/1929
300 W6 North elevation
300 W6 South elevation #51 10/14/1929
300 W6 South elevation 3/5/1931
300 W6 West elevation & chimney details
300 W6 West elevation & chimney details #53 10/19/1929
300 Y7 Interior elevations of governor's private office #213 10/14/1929
300 W6 Interior elevations of governor's reception room 10/14/1929
300 W6 Interior elevations - reception rooms & offices
300 W6 Interior elevations & details of Senate (2 sheets)
300 W6 Quarter plan & elevation of rotunda, sec. BB main stair & corridor 10/14/1929
300 W6 Quarter plan & elevation AA rotunda, sec. BB main stair & corridor 4/4/1930
300 Y7 Half elevation & cross section of Gallery arches
300 Y7 Longitudinal section 10/14/1929
300 W6 Longitudinal section rev. 3/5/1931
300 W6 Longitudinal section #54 10/14/1929
300 W6 Longitudinal section #54 rev. 4/14/1930
300 Y7 Longitudinal section #54 rev. 3/5/1931
300 Y7 Transverse section showing dome
300 W6 Transverse section through dome & foyers #55 rev. 4/4/1930
300 W6 Transverse section through dome & foyers n.d.
300 W6 Section "CC" of main stair & corridor - elevation "DD" & "EE" rotunda #208 10/14/1929
300 W6 Section "CC" of main stair & corridor - elevation "DD" & "EE" rotunda #208 rev. 4/4/1930
300 W6 Half section through capitol of dome looking south #205 10/14/1929
300 W6 Half section through capitol of dome looking south, half section through capitol of dome & portico east

Floor Plans
400 Y6 Typical floor plans, basement, ground, first
400 W5 Basement floor plan #0.1 rev. 1/20/1930 (2 sheets)
400 Y6 Basement floor plan, main East
400 W5 Ground floor plan #1 rev. 3/7/1931
400 W5 Ground floor plan #1 10/14/1929
400 W5 Ground floor plan #1 rev. 4/4/1930 (2 sheets)
400 W5 First floor plan #2 rev. 4/4/1930
400 W5 First floor plan #2 10/14/1929
400 W5 First floor plan #2 rev. 3/4/1931 (2 sheets)
400 Y6 First floor plan, main East
400 Y6 First floor plan, main West
400 W5 Second floor plan #3 10/14/1929
400 W5 Second floor plan #3 3/7/1931 (2 sheets)
400 Y6 Second floor plan, main East
400 Y6 Second floor plan, main West
400 Y6 Second floor plan, "DD"
400 Y6 Third floor plan, main East
400 Y6 Third floor plan, main West
400 Y6 Dome space study
400 Y6 Alterations to room under north steps for ID bureau of Dept. of Public Safety
400 Y6 Plan of partitions, rooms 127-44, 190
400 Y6 Floor plans - library, new museum layout basement west side rotunda, east side museum lobby ca. 1935 (3 sheets)

Roof Plans
500 Y6 Roof plans
500 W5 Roof plan & plan through dome #4 rev. 4/19/1930
500 W5 Roof plan & plan through dome #4 10/14/1929
500 W5 Roof plans & plan through dome #4 rev. 3/1/1931

Framing Plans
600 W5 Ground floor framing, east, n.d.
600 W5 Ground floor framing, west, n.d.
600 W5 First floor framing, east, 10/14/1929
600 W5 First floor framing, west, n.d.
600 W5 Second floor framing, east #1003E 10/14/1929
600 W5 Second floor framing, west #1003W 10/14/1929
600 W5 Third floor framing, east, n.d.
600 W5 Third floor framing, west, n.d.
600 W5 Floors 4-7 framing plans, n.d.
600 Y6 Roof framing plan
600 W5 Framing plan of dome, n.d.

Electrical/Mechanical
700 W4 Electrical plan - ground, first, second floors & roof n.d. (5 sheets)
700 W4 Basement electrical plan 10/14/1929
700 W4 Basement electrical plan #600 10/14/1929 (trans reduc)
700 W4 Ground floor electric plan #601 10/14/1929 (trans reduc)
700 W4 First floor electric plan #602 10/14/1929 (trans reduc)
700 W4 Second floor electric plan #603 10/14/1929 (trans reduc)
700 W4 Electric plan of roof through dome rev. 5/21/1930
700 W4 Electric plan of roof & through dome 10/14/1929
700 W4 Electric riser diagram 10/14/1929
700 Y6 Electrical modernization single line diagram
700 Y5 Low voltage modernization
700 Y5 Electrical service governor's suite
700 Y5 Lighting details - basement main West #223 9/1971 (3 sheets)
700 Y5 Lighting details - ground floor - rewiring details
700 Y5 Emergency lighting system, installation details
700 Y6 Lighting & ceiling section & details, museum
700 Y5 Lighting in small rotundas - installation & details #209-1 4/3/1971
700 Y5 Reception room AC #218 n.d. (2 sheets)
700 Y5 Special lighting governor's reception room #226 11/30/1971
700 Y5 Plans for revised heating system
700 Y5 Heating electrical system basement east side
700 Y5 Heating electrical system basement west side
700 W4 Basement floor heating & ventilating 10/14/1929
700 W4 Ground floor - heating, ventilating, plumbing #501 10/14/1929
700 W4 First floor - heating, ventilating, plumbing 10/14/1929
700 W4 Second floor - heating, ventilating, plumbing 10/14/1929
700 W4 Roof plan - heating, ventilating, plumbing 10/14/1929
700 W4 Misc. heating & ventilating details 10/14/1929
700 W4 Ground floor plan heating, plumbing details 10/14/1929
700 Y4 Heating/air conditioning (2) (5 sheets)
700 W4 Basement & riser diagram plumbing n.d.
700 W4 Riser diagram, basement plumbing 10/14/1929
700 Y5 Plumbing details #553 rev. 5/19/1926
700 Z3 New toilet installation 2/5/1931
700 Y4 Air conditioning main unit (50 sheets)
700 Y5 Air conditioning phase II video conduit (8 sheets)
700 Y5 Basement main - air conditioning (4 sheets)
700 Y5 Alternate air conditioning west basement
700 Y6 Air conditioning basement & ground floor plans & details
700 Y6 Air conditioning basement & ground floor, electrical & control details
700 Z3 Penthouse air conditioning 3/5/1975
700 Y6 Air conditioning, main unit piping over cafeteria
700 Y5 Air conditioning, main unit electrical control conduit over cafeteria ceiling
700 Y4 Part plan of governor's suite, showing air conditioning alt.
700 Y6 Air conditioning plans & details, alt. to offices, gov. suite
700 Y4 Air conditioning, supply & return schedules, basement & gov. suite; also East elevation gov. private office
700 Y6 Air conditioning details for gov. conference room
700 Y4 Air conditioning, longitudinal sections of new museum & gov. suite
700 Y6 Air conditioning, museum
700 Y4 House air conditioning
700 Y6 Piping flow diagram, Supreme Court offices air conditioning
700 Y5 Air conditioning & electrical details
700 Y4 Wiring diagram, fire alarm system
700 Y4 Cafeteria chemical fire protection system (2 sheets)
700 Y5 Sprinkler system
700 Y5 Mechanical/electrical/foundation details - gov. office emergency generation
700 Y5 Chilled water interconnect piping, basement main east 4/7/1981
700 Y5 Ground floor renovation lighting, AC, electric - Federal State Relations #224 9/30/1971 (4 sheets)

Details & Schedules
800 W2 Exterior details of main entrance porticos #103 10/14/1929
800 W2 Exterior details of end pavilions #101 10/14/1929
800 W2 Exterior details of E. & W. loggias #102 10/14/1929
800 Y4 Terrace, balustrade & steps
800 Z2 Plan of terrace & steps, N. side portico 9/10/1941
800 Y4 Terrace, balustrade, steps S. side #103 3/12/1942
800 Y4 Plan of building terrace S. & W. side
800 Y4 Plan of terrace E. & W. sides building
800 Z2 Plan of garage & steps, east side steps on north side MB
800 Z2 Section garage & steps, east side steps on north side MB
800 Z3 Section garage & steps, east side steps on north side MB
800 Y4 Repair of stonework, plans & details
800 Y3 Details of cornerstone
800 Y3 Sketch showing cracked stone
800 Z2 Porte cochere
800 Z2 Porte cochere details
800 W2 Details of Senate & House foyers, vestibules & entry, schedule #203 rev. 4/4/1930
800 Y4 Plan of Senate & House entries & vestibules
800 W2 Senate & House foyer, vestibule & entry
800 W2 Senate & House rostra #211 rev. 4/4/1930
800 W3 Details of rostra, Senate & House
800 W2 Senate & House rostra 10/14/1929
800 W3 Clerk's desk in House & Senate rev. 5/11/1931
800 Y4 Senate & House retiring rooms & gov. reception room
800 Z2 New marble back of House & Senate platforms 2/2/1932
800 Z2 Additional marble, House & Senate 9/30/1931
800 W2 Details of House #202 10/14/1929
800 W2 Details of House #202 rev. 4/4/1930
800 W2 Details of House rev. 3/10/1931
800 Y3 Gallery seats in House
800 W2 Details of Senate #201 10/14/1929
800 W2 Details of Senate #201 rev. 4/4/1930
800 W2 Details of Senate #201 rev. 3/10/1931
800 Y3 Gallery seats in Senate
800 Y3 Senate dome style 0-1 circular grilles
800 W3 Plaster ceiling & cornice, E. & W. foyers 1/23/1931
800 Y3 Plaster ceiling border gov. private office
800 Y3 Cornice at domical ceiling landing, stairs 1 & 2
800 W2 Main wall column & pilaster shafts & caps n.d.
800 Z3 Revised drawing of mutules in gov. reception room n.d.
800 Z3 Office paneling details, plans & elevations (3 sheets) 3/26/1931
800 W3 Interior details - ground floor & Doric hall rec. 4/4/1930
800 W3 Interior details - ground floor rotunda & Doric hall #209 10/14/1929
800 W2 Details of dome, drum of dome & lantern #104 ca. 1/15/1930
800 Z2 Details rustication at interior of dome at 4th floor level
800 Z3 Stone panel inscription drum of dome 7/3/1931
800 Z2 Marble entablature - rotunda 1/20/1930
800 W3 Marble entablature over columns - rotunda 1/14/1931
800 W3 Marble entablature over pendentive - rotunda 1/14/1931
800 W2 Marble key block - main arches - rotunda 1/20/1930
800 W2 Marble arches & vaults - rotunda 1/14/1931
800 Y3 Proposed marble work - rotunda arches, vaults
800 Z2 No. 22 vault front & masonry opening 10/20/1931
800 W2 Column schedule #1007 10/14/1929
800 Y3 Misc. details of columns
800 Y3 Framing section detail, stairs
800 Y3 Detail of stairway
800 W3 Details of stairway & toilet rooms #207 10/14/1929
800 Y4 Radiator grilles & exterior stairwells
800 W2 Stair handrails, stairs #2-5 7/11/1931
800 Z3 Brace for stair rail 6/18/1930
800 Z2 Handrail brackets/rosettes for stairs 2/17/1931
800 Z2 Stair hand rails 10/5/1931
800 Z2 Newels for stairs 11/18/1930
800 W3 Details of ground floor corridor & stairway #2-5 #306 rev. 4/4/1930
800 W3 Details of ground floor corridor & stairway #2-5 10/14/1929
800 Z3 Location of bronze memorial tablets A, B, & C 9/11/1931
800 W2 Detail of bronze tablet B n.d. ca. 1930?
800 W2 Detail of bronze tablet C (memory of Roy Earl Parrish) n.d.
800 Z2 Bronze tablets 8/14/1931
800 Z2 Bronze tablets 8/14/1931
800 Y3 Full size elevation of cast bronze plaque
800 Z2 Bronze grille details 1/22/1931
800 Z2 Bronze grilles 8/4/1931
800 Y3 Cast bronze grille, ground floor windows, E. & W. loggias
800 W3 Exterior bronze railings 1/28/1931
800 Y3 Bronze thresholds required
800 Y3 Double-hung bronze windows
800 Y4 Double-hung bronze windows
800 W2 Double-hung bronze windows marked "I" rev. 9/5/1930
800 W2 Casement windows, bronze
800 Y3 Panels at top of windows marked "wide"
800 Y3 Schedule of window stools
800 Y3 Detail of hanging stile "F" doors 10/21/1930
800 Y3 Framing section detail, jamb B-7 door, governor's room
800 W2 Framing section details of A1-B5 & exterior doors 10/21/1930
800 Y3 Details of door, hardware
800 Y3 "B" door conditions changing to meet job dimensions
800 Z2 Tile floor pattern for all toilet rooms & janitor closets 3/30/1931
800 Z3 Typical stall details
800 Z3 Sketch of lamp, MB 11/24/1927
800 W3 Lamp details - chandelier - rotunda 12/12/1924
800 Y3 Secretary of State? - details of vault & pigeon holes (3 sheets)
800 Z2 Fireplace hearths 3/9/1931
800 Y4 Detail of leader head
800 W2 Proposed porete roof slabs 6/10/1931
800 Y4 Mezzanine addition rooms 2, 4, 6
800 Y4 Details, wall cases in Senate & House clerks' rooms (3 sheets) 8/24/1931

Miscellaneous
900 Z2 Fringe for leather covered doors 12/22/1930
900 Y3 Inaugural stand for M. M. Neely
900 Z2 Post office, file cases, wardrobe & sign board 5/6/1931
900 Z2 Space allocation - basement n.d.
900 Z2 Roster of 1947 Senate n.d.
900 Z2 Roster of 1947 House n.d.
900 Z2 Table plan n.d.
900 Z2 Subdivided space 21, ground floor 1/30/1930
900 Z2 Order sheet, WV Rail Co. 9/11/1930
900 Y3 Food service equipment (13 sheets)
900 Y3 Food service - HVAC, plumbing, lighting (22 sheets)
900 Y3 Civil Defense plan (19 sheets)
900 Y3 Rotunda information center (7 sheets)
900 Y3 Alterations to capitol, Dept. of Civil & Defense Mobilization #6613 (3 sheets) April 1967


Series III: West Wing (Building 1)


Landscape/Foundation
100 Y10 Foundation plan
100 Y10 Foundation plan
100 Y10 Foundation plan
100 Y10 Alternate foundation plan
100 Y10 Alternate foundation plan
100 Z4 Foundation borings

Plot Plans
200 Y10 General plot plan
200 Y10 Plot plan
200 Y10 Plot plan

Elevations & Schedules
300 Y10 North & south elevations
300 Y10 East elevation
300 Y10 East elevation building #1 #51 11/10/1923
300 Y10 West elevation #52 11/10/1923
300 Y10 West elevation
300 W7 Elevation main entrance hall corridor
300 Y10 Longitudinal section
300 Y10 Longitudinal section
300 Y10 Longitudinal section
300 Z4 Transverse section 11/10/1923

Floor Plans
400 Y10 Basement plan
400 Y10 Basement floor plan
400 Y10 Basement plan & details
400 Y10 Ground floor plan
400 Y10 First floor plan
400 Y10 First floor plan
400 Y10 First floor plan
400 Y10 Second floor plan
400 Y10 Second floor plan
400 Y10 Third floor plan
400 Y10 Third floor plan
400 Y10 Third floor plan
400 Y10 West Wing first floor slabs
400 Y10 Main hall & corridor
400 Y10 Plans & details, remodeled office space, Data Processing Division, Tax Dept. (4 sheets)

Roof Plans
500 Y9 Penthouse & roof plan
500 Y9 Penthouse roof plan

Framing Plans
600 Y9 Ground floor framing plan
600 Y9 Ground floor framing plan
600 Y9 First floor framing plan
600 Y9 First floor framing plan
600 Y9 Second & third floor framing plans
600 Y9 Penthouse roof framing plans & col. schedule
600 Y9 Roof framing plan
600 Y9 Roof framing plan

Electrical/Mechanical
700 Y9 Basement floor plan electric wiring (trans reduc)
700 Y9 Basement floor plan electric wiring
700 Y8 Ground floor plan electric wiring
700 Y9 Ground floor plan electric wiring #602 (trans reduc)
700 Y9 First floor plan electric wiring
700 Y9 First floor plan electric wiring #603 (trans reduc)
700 Y9 First floor plan electric wiring
700 Y9 Second floor plan electric wiring
700 Y9 Second floor plan electric wiring
700 Y9 Second floor plan electric wiring
700 Y9 Third floor plan electric wiring
700 Y8 Third floor plan electric wiring
700 Y8 Third floor plan electric wiring
700 Y9 Penthouse plan electric wiring
700 Y8 Roof plan electric wiring
700 Y9 West Wing receptacle rewiring, basement
700 Y9 West Wing receptacle rewiring, third floor
700 Y9 West Wing receptacle rewiring, fourth floor
700 Y8 Second floor new power panel room W210
700 Z4 Wiring diagram duplex special pilot control 11/11/1924
700 Y9 Electrical details - switchboard
700 Z4 Ground & basement plans - switchboard room n.d.
700 Y8 Riser diagram, power, light & switchboard detail
700 Y8 Electrical & lighting details - basement, second, third, fourth, penthouse floors
700 Y8 Revised layout of lighting in vault
700 Y8 Power plan & details - power panel computer area room B112
700 Y8 Power plans - computer B112 (5 sheets)
700 Y8 Power plan - computer area B111, B112; implementation plan B1- 4
700 Y9 Basement plan heating
700 Y8 Riser diagram heating, details
700 Y8 Ground floor plumbing, heating, ventilating
700 Y9 First floor plumbing, heating, ventilating
700 Y8 Second floor plan plumbing, heating, ventilating
700 Y8 Third floor plan plumbing, heating, ventilating
700 Y8 Penthouse plan plumbing, heating, ventilating
700 Y9 Basement plan plumbing
700 Y8 Riser diagram plumbing
700 Y8 Riser diagram plumbing
700 Y8 Plumbing details
700 Y8 Plumbing details
700 Z4 Changing partition & addition of toilet room #507A 6/16/1931
700 Z4 Changing partition & addition of toilet room
700 Y9 Air conditioning plans system AR, plans & riser diagram (19 sheets) 1973
700 Y9 Air conditioning plans system B (17 sheets)
700 Y8 Piping plan & details basement air conditioning
700 Y8 Power plan - computer (4 sheets)
700 Y9 Electric switch room basement #180-2 1969 revisions 7/15/1969

Details & Schedules
800 W7 Lamp details
800 Y8 Typical toilet room details
800 Y8 Typical toilet room details
800 Y8 Typical door details
800 Y8 Lamp details
800 Z4 Lamp details
800 Y8 Lamp details
800 Y8 Lamp detail
800 Z4 Lamp detail
800 Z4 Floor construction & stone concrete

Miscellaneous
900 Z4 List of office numbers
900 Z4 Bronze tablet
900 Z4 Space reallocation - floor plan penthouse


Series IV: East Wing (Building 2)


Landscape/Foundation
100 Y15 Foundation plan
100 Y15 Foundation plan
100 Y15 Foundation plan
100 Y15 Foundation plan
100 Y15 Foundation plan
100 Y15 Alternate foundation plan
100 Z4 Foundation borings 11/22/1922
100 W7 Exterior details
100 Y15 Exterior details rear of building
100 W7 Exterior details rear of building
100 Y15 Exterior details rear of building
100 Y15 North end of foundation & tunnel details
100 Y15 Concrete driveway & sidewalks

Elevations & Sections
300 Y14 North & south elevations
300 Y14 North & south elevations
300 Y14 North & south elevations
300 Y14 East elevation
300 Y14 East elevation
300 Y14 East elevation
300 Y14 East elevation
300 Y14 West elevation
300 Y14 West elevation
300 Y14 West elevation
300 Y14 West elevation
300 Y14 Longitudinal section #55A rev. 7/30/1926
300 Y14 Longitudinal section #55A rev. 5/19/1926
300 Y14 Longitudinal section #55A 6/18/1924
300 Y14 Longitudinal section #55A 6/5/1923
300 Z4 Transverse section 6/5/1923
300 Y14 Transverse section
300 Y14 Transverse section
300 Y14 Transverse section

Floor Plans
400 Y13 Basement floor plan
400 Y14 Basement floor plan
400 Y14 Basement floor plan
400 Y13 Ground floor plan
400 Y13 Ground floor plan
400 Y13 Ground floor plan
400 Y14 Ground floor plan
400 Y14 Ground floor plan
400 Y13 First floor plan
400 Y13 First floor plan
400 Y13 First floor plan
400 Y14 First floor plan
400 Y14 Second floor plan
400 Y14 Second floor plan
400 Y14 Second floor plan
400 Y14 Second floor plan (2 sheets)
400 Y13 Third floor plan #5A 6/18/1924
400 Y13 Third floor plan #5A rev. 7/29/1926
400 Y13 Third floor plan
400 Y13 Alterations on third floor
400 Z4 Fourth floor plan n.d.
400 W7 Plan & section of Supreme Court room #207A 5/19/1926
400 W7 Plan & section of Supreme Court room (2 sheets) n.d.
400 W7 Plan & section of Supreme Court room #207A 6/18/1924
400 Z4 Stack room 7/5/1927
400 Y14 Plan of main hall & corridor
400 Y14 Plan of main hall & corridor
400 Y14 Alterations to Dept. of Agriculture offices, rooms 100-112

Roof Plans
500 Y13 Penthouse & roof plan
500 Y13 Penthouse & roof plan

Framing Plans
600 Y13 Ground floor framing plan
600 Y13 Ground floor framing plan
600 Y13 Ground floor framing plan
600 Y13 First floor framing plan
600 Y13 First floor framing plan
600 Y13 First floor framing plan
600 Y13 Second floor framing plan
600 Y13 Second floor framing plan
600 Y13 Second floor framing plan
600 Y13 Third floor framing plan
600 Y13 Third floor framing plan
600 Y13 Third floor framing plan
600 Y13 Roof framing plan
600 Y13 Roof framing plan
600 Y13 Roof framing plan

Electrical/Mechanical
700 Y13 Air conditioning East Wing (19 sheets)
700 Y12 Basement floor plan electric wiring
700 Y12 Basement floor plan electric wiring (trans. reduc)
700 Y12 Basement floor plan electric wiring
700 Y12 Ground floor plan electric wiring
700 Y12 Ground floor plan under floor electric wiring
700 Y12 Ground floor plan electric wiring 3/14/1926
700 Y11 Ground floor plan electric wiring #602A (trans. reduc)
700 Y12 First floor plan electric wiring 6/18/1926
700 Y11 First floor plan electric wiring #603A 6/5/1923 (trans. reduc)
700 Y11 First floor plan electric wiring
700 Y11 First floor plan under floor electric wiring 6/18/1924
700 Y11 Second floor plan electric wiring
700 Y11 Second floor plan electric wiring
700 Y11 Second floor plan electric wiring
700 Y11 Second floor plan under floor electric wiring
700 Y11 Third floor plan electric wiring rev. 5/19/1926
700 Y11 Third floor plan electric wiring
700 Y11 Third floor plan electric wiring
700 Y11 Penthouse plan electric wiring
700 Y11 Penthouse plan electric wiring
700 Y11 Penthouse plan electric wiring
700 Y12 Low voltage modernization (12 sheets) 1974-75
700 Y12 Third floor electrical & lighting details (3 sheets)
700 Y11 Riser diagram power & light detail
700 Y11 Riser diagram lighting panel detail
700 Y11 Riser diagram lighting panel detail
700 Y11 Basement plan heating
700 Y12 Basement plan heating
700 Y12 Mezzanine plan heating
700 Y12 Riser diagram heating details
700 Y12 Riser diagram heating details
700 Y12 Riser diagram - heating
700 Y11 Ground floor plan plumbing, heating, ventilating
700 Y12 Ground floor plan plumbing, heating, ventilating
700 Y12 Ground floor plan plumbing, heating, ventilating
700 Y12 First floor plan plumbing, heating, ventilating
700 Y12 First floor plan plumbing, heating, ventilating
700 Y12 First floor plan plumbing, heating, ventilating
700 Y13 Second floor plan plumbing, heating, ventilating
700 Y13 Second floor plan plumbing, heating, ventilating
700 Y12 Second floor plan plumbing, heating, ventilating
700 Y12 Third floor plan plumbing, heating, ventilating
700 Y12 Third floor plan plumbing, heating, ventilating
700 Y13 Third floor plan plumbing, heating, ventilating
700 Y12 Penthouse & roof plan plumbing, heating, ventilating
700 Y12 Penthouse plan plumbing, heating, ventilating
700 Y11 Basement plan plumbing
700 Y12 Basement plan plumbing
700 Y12 Basement plan plumbing
700 Y11 Plumbing riser diagram
700 Y11 Plumbing riser diagram
700 Y12 Air conditioning - basement, ground, second, penthouse (4 sheets)
700 Y12 Mezzanine heating & electric plan, air conditioning
700 Y12 Library air conditioning (8 sheets)
700 Y13 Supreme Court HVAC; air conditioning East Wing (2 sheets)
700 Y11 Air conditioning system for computer room

Details and Schedules
800 W7 Detail of main entrance hall, door, stairway
800 Y11 Column schedule & penthouse roof
800 Y11 Column schedule & penthouse roof
800 Y11 Column schedule & penthouse roof framing plan
800 Y11 Toilet room details
800 Y11 Toilet room details
800 Y11 Toilet room details
800 Y11 Toilet room details
800 Y11 Toilet room details
800 Y11 Typical door details
800 Y11 Typical door details
800 Y11 Bench in court room
800 Y11 Bench, platform & railing in Supreme Court
800 W7 Details Supreme Court Room n.d.

Miscellaneous
900 Y11 Plans showing layout for old & new equipment, Supreme Court (2 sheets)
900 Y11 Emergency operations center - East Wing (18 sheets)
900 Z4 Road Commission proposed steel shelving, rooms 25-27
900 Z4 PSC steel equipment, first floor vault Room 129, proposed steel shelving & equipment (2 sheets)
900 Z4 Department of Agriculture pigeon hole cases & proposed steel shelving & equipment 2 sheets)
900 Y11 Pigeon hole & shelving elevations; misc. plans Department of Agriculture, Supreme Court, PSC, Road Commission (11 sheets)
900 Y11 Emergency Operations Center risers - fire alarm, sound #8089- 5017 7/26/1979 (2 sheets)


Series V: Powerhouse


Landscape/Foundation
100 Y15 Foundation plan

Elevations & Sections
300 Y15 North & south elevations
300 Y15 East elevation
300 Y15 West elevation
300 Y15 Longitudinal section
300 Y15 Longitudinal section
300 Y15 Cross-sectionals through power house mezzanine & coal burner

Floor Plans
400 Y15 Plan of boiler room floor level #1B 1923
400 Y15 Plan at level of first mezzanine
400 Y15 Plan at level of pipe gallery

Framing Plans
600 Y15 Gallery floor framing plan

Electrical/Mechanical
700 Z4 Circulating pump motors
700 Z4 Sump pump motors
700 Z4 Duplex control panel for special pilot control
700 Y15 Generator & boiler room - PL, electrical wiring #601B 1923
700 Y15 Plan at gallery level showing high pressure piping
700 Y15 Plan at boiler room level showing exhaust piping, etc.
700 Y15 First mezzanine Amberson General Room plan electric wiring

Details & Schedules
800 Y15 Column schedule & details
800 Y15 Details of proposed chimney


Series VI: Holly Grove


Floor Plans:
400 Y15 Holly Grove renovations (4 sheets)

Series VII: Governor's Mansion


Elevations & Sections:
300 Y16 Elevations & sections, 1923 (4 sheets)

Floor Plans:
400 Y16 Floor plans, 1923 (4 sheets)

Electrical/Mechanical:
700 Y16 Mechanical plant improvements (4 sheets)
700 Y16 Fire alarm/security system, 1978 (10 sheets)
700 Z5 Lavatory cabinet, 1957
700 Y16 Third floor heating & air conditioning, 1966
700 Z5 Sun porch air conditioning
700 Z5 Toilet plans, 1966
700 Y16 Mechanical plans, 1923 (4 sheets)
700 Y16 Mechanical plant improvements (5 sheets)
700 Y16 Security system #539-5001-E3 Oct-Nov 1977 (8 sheets)

Details & Schedules:
800 Z5 Details of molding, alterations to library, north elevation closet door (2 sheets)
800 Z5 Living room mantel, 1966
800 Z5 Additions to garage, 1966
800 Z5 Details of kitchen renovation (2 sheets)
800 Z5 Kitchen island
800 Y16 Alterations to library, 1966 (2 sheets)
800 Y16 Details of kitchen renovation, 1965 (2 sheets)
800 Y16 Details of paneling/molding renovation, 1965 (2 sheets)
800 Y16 Details of stone & marble, 1923 (2 sheets)
800 Y16 Improvements to living quarters (2 sheets)
800 Y16 Alterations to kitchen by United Fuel Gas Co. 12/31/65

Miscellaneous:
900 Y16 Parking control station #1
900 Y16 Parking control station #2


Series VIII Motor Vehicles Building (now Building 3)


Landscape/Foundation:
100 Y16 Foundation plans & details (4 sheets)

Elevations & Sections:
300 Y16 Elevations - N, S, E, W, (3 sheets)
300 Y16 Longitudinal section AA; cross section BB (2 sheets)

Floor Plans:
400 Y16 Floor plans - basement, ground, 2-8, machine room (10 sheets)

Roof Plans:
500 Y16 Roof plans (2 sheets)

Electrical/Mechanical:
700 Y16 Fire alarm system - equipment plan & riser diagram (2 sheets)
700 Y16 Electrical details, basement, 2nd, 3rd #181 10/29/1969 (4 sheets)

Details & Schedules:
800 Y16 Details of entrance & stairs (6 sheets)


Series IX: Office Building, SE corner Washington & California (now Building 4)


Landscape/Foundation:
100 Y17 Foundation plans & details (7 sheets)

Plot Plans:
200 Y17 Plot plans (2 sheets)

Elevations & Sections:
300 Y17 N,S,E,W elevations (6 sheets)
300 Y17 Longitudinal section

Floor Plans:
400 Y17 Basement, 1st, 2nd, 6th, clerestory floor plans (9 sheets)

Roof Plans:
500 Y17 Penthouse & roof plans (2 sheets)

Framing Plans:
600 Y17 Framing plans - 1st, clerestory, roof (4 sheets)

Electrical/Mechanical:
700 Y17 Fire alarm system (9 sheets)
700 Y17 Electrical, AC, plumbing plans (30 sheets)
700 Y17 Fire alarm system #8039-5010 6/29/1978 (13 sheets)

Details & Schedules:
800 Y17 Window, door & stair details (4 sheets)
800 Y17 Wall & entrance details, column schedule (6 sheets)


Series X: Office Building, NW corner Washington & California (now Buildings 5, 6, 7)

Landscape/Foundation:
100 Y18 Foundation, plaza, landscaping, parking (15 sheets)
100 Y18 Foundation plan
100 Y18 Landscape (sheet 54 of 96) n.d.

Plot Plans:
200 Y18 Units A, B, C - plot plan

Elevations & Sections:
300 Y18 Unit A - elevations, N,S,E,W (4 sheets)
300 Y18 Unit A - elevation & detail of bents
300 Y18 Unit B - elevation & detail of bents
300 Y18 Unit C - elevations, N,E
300 Y18 Units B & C - elevations N,S,E,W
300 Y18 Unit A - cross section
300 Y18 Unit B - cross section; Unit C - S. elevation

Floor Plans:
400 Y18 Unit A - floor plans, basement-eleven (12 sheets)
400 Y18 Unit B - floor plans, basement-nine (10 sheets)
400 Y18 Unit C - floor plans, basement-second (3 sheets)
400 Y18 Floor plan, basement-eleven 5/18/1964 (12 sheets)

Roof Plans:
500 Y18 Roof plans, Units A, B, C (3 sheets)

Framing Plans:
600 Y17 Unit A - framing plans 1st-3rd, 11th, roof (6 sheets)
600 Y17 Unit B - framing plans 1st-3rd, 9th, roof (6 sheets)
600 Y18 Unit C - framing plans 1st 2nd roof (3 sheets)

Electrical/Mechanical:
700 Y17 Unit B - power riser diagram
700 Y17 Units A, B, C - AC system ISS-Liebert 4/14/1978 (5 sheets)

Details & Schedules:
800 Y17 Unit A - column, ceiling, stair, elevator, exterior walls & roof details (7 sheets)
800 Y17 Unit B - stair, elevator, column details (2 sheets)
800 Y17 Unit C - column, wall, roof, door, stair details (6 sheets)
800 Y17 Units A & B - ceiling, windows, column & exterior details (4 sheets)
800 Y17 Units C & B - column, elevator, ceiling & stair details (3 sheets)
800 Y17 Miscellaneous details (3 sheets)

Miscellaneous:
900 Y17 Legend & structural description (2 sheets)
900 Y17 Property acquisition (7 sheets)
900 Y17 Central sign shop, traffic engineering division #TE-71-47, 1971 (6 sheets)
900 Y17 Conveyor system details


Series XI: Science & Cultural Center

Landscape/Foundation:
100 Y18 Site plan Silling Assoc. 7/16/1973
100 Y18 Landscaping plans LD 1-3 revised 6/19/1975 (3 sheets)
100 Y18 Site plan 1/15/1973

Elevations & Sections:
300 Y18 Architectural drawings, 1973 (31 sheets)
300 Y19 Partial exhibit level plan, SW corner
300 Y19 Elevations & sections 1/15/1973 (3 sheets)
300 Y19 Elevations & sections Silling Assoc. 7/16/1973 (11 sheets)

Floor Plans:
400 Y19 Floor plans - exhibit, plaza, 3rd, Ireland Assoc. 10/28/1974 (3 sheets)
400 Y19 Floor plans 1/15/1973 (5 sheets)
400 Y19 Office arrangement, partial 3rd detail 8/26/1975 (2 sheets)
400 Y19 Floor plans Silling Assoc. 7/16/1973 (10 sheets)

Framing Plans:
600 Y19 Structural plans, 1973 (33 sheets)
600 Y19 Caissons, 1973

Electrical/Mechanical:
700 Y19 Electrical/lighting plans & details (23 sheets)
700 Y19 Plumbing plot plan
700 Y19 AHU controls #339-55 3/1974 (6 sheets)
700 Y19 Office arrangement, partial 3rd electrical & mechanical 8/26/1975 (2 sheets)
700 Y19 Plumbing plans, 1973 (7 sheets)
700 Y19 Mechanical drawings, 1973 (15 sheets)

Details & Schedules:
800 Y19 Schedules & details Silling Assoc. 7/16/1973 (9 sheets)
800 Y19 Schedule 1/15/1973

Miscellaneous:
900 Y19 Exhibits & furnishings Ireland Assoc. 5/16/1975 (16 sheets)
900 Y19 Index to drawings 1973


Series XII: Parking Building facing California (now Building 2)

Landscape/Foundation:

100 Y19 Plan of parking lots

Plot Plans:
200 Y19 Plot plan

Elevations & Sections:
300 Y19 Elevations & sections - N,S,E,W (2 sheets)

Floor Plans:
400 Y19 Typical floor plans (3 sheets)

Roof Plans:
500 Y19 Roof plan

Framing Plans:
600 Y19 Floor & roof framing (3 sheets)

Electrical/Mechanical:
700 Y19 Electric plans - ground, roof (3 sheets)
700 Y19 Drainage plans & riser diagram (4 sheets)

Details & Schedules:
800 Y19 Column schedule & exterior details (2 sheets)


Series XIII: Miscellaneous - Events, Statuary, Access Roads

Y19 Statue - Lincoln Walks at Midnight
Y19 Greenbrier Street improvements (5 sheets)
Y19 Labor Day & July 4th picnics (2 sheets)
W7 Inaugural events (8 sheets)
W7 Floor plan, 1977 Inaugural Ball
W7 Inaugural stand (14 sheets)
Y19 Inaugural stand of Governor Moore, rev. 11/26/1984 (3 sheets)


Series XIV: Commerce Building (formerly WV Contractors Association Building, now Building 17)

Landscape/Foundation:
100 Y23 Site & foundation plan, 3/1/1978 (2 sheets)

Elevations & Sections:
300 Y23 Elevations & building sections, 3/1/1978 (7 sheets)

Floor Plans:
400 Y23 Floor plans, 1st - 3rd, 3/1/1978 (3 sheets)

Roof Plans:
500 Y23 Roof plan, 3/1/1978

Framing Plans:
600 Y23 Framing plans, 2nd 3rd roof 3/1/1978 (3 sheets)

Electrical/Mechanical:
700 Y23 Plumbing, electrical, HVAC 3/1/1978 (10 sheets)

Miscellaneous:
900 Y23 Cover sketch & legend, 3/1/1978


Materials acquired from Butterfields: housed in Dr212

Drawings/Blueprints - possible sites for Main Capitol Building

Location 4 schemes A-D, 08/17/1921 - (appears to be on Capitol Hill - north extension of Capitol Street, scheme A shows Capitol and Broad (now Leon Sullivan Way). 2 site elevations, 4 plans

Sites 6 & 7, 08/1921 - bordered by Washington, California, Kanawha and Duffy or Washington, Kentucky, Kanawha and Oney. 4 drawings, 1 memo

Duffy Street Site, 12/1921 - bordered by Washington, California, Kanawha and Duffy - very close to current location. 13 pp

Site 14 - 09/1921 Edgewood Drive. 7 pp

McFarland Street Site, 12/1921 - bordered by McFarland, Virginia, Broad (now Leon Sullivan Way) and Kanawha. 1 p.

Capitol Hill Site 12/1921 - bordered by Smith, Summers, Capitol Hill and Shrewsbury. 1 p.

Old Capitol Site 12/1921 - bordered by Capitol, Washington, Shrewsbury and Lee. 1 p.

Sites 9 and 5 n.d. - Site 9 across Elk on West Side centered at Monongalia and Pennsylvania; Site 5 centered at Virginia and Clendenin near Elk/Kanawha confluence. 2 pp.

Site 23 n.d. elevated above C&O railroad tracks and Kanawha River, possibly in South Hills - 3 pp.

Sites 17 and 18 08/1921 - site along Kanawha River including lagoon 6 pp.

Site 20 08/1921 no location given, schemes A-B, 6 pp. drawings and 1 memo

Drawings/Blueprints - Main Capitol Building

Sketch, pencil, of concrete beams Room 59 Ground floor, 12 July 1924

Large bid sheet, Proposal for General Construction and Mechanical Equipment Office Building #1, opened 21 December 1923

Blueprint, Detail of Dome, Drum of Dome and Lantern; Plans " and 1" scale Drawing #104, n.d. (Original on linen)

Folder labeled Exterior Scale Details 101 to 113, 108-P1

Blueprint, Exterior Details of Main Entrance Portico, Drawing #103 14 October 1929 (rev. 4 April 1930) (original on linen)

Blueprint, Exterior Details of East and West Loggias, Drawing #102 14 October 1929 (rev. 4 April 1930) (original on linen)

Blueprint, Exterior Details of End Pavilions, Drawing #101 14 October 1929 (rev. 4 April 1930) (original on linen)

Blueprint, Porte Cochere Grades of Drive "Y" and Borders, Drawing #107 26 June 1930 (pencil on tracing paper)

Blueprint, Inscription for Stone Panels Drum of Dome, Drawing #113, 3 July 1931 (pencil on tracing paper)

Photostatic negative copy of streets adjacent to Capitol Building construction site showing radius, top of rail main track 603.95 U.S.G. Survey. "Note:- Have taken a reading on the main track from ground floor Main Bldg. ground floor= 56.000, Top of rail= 46.345=9.6555" Initials HSW.3/8/32. Reverse side has unidentified sketch of unidentified building facade in pencil. [rolled and creased]

Photostatic negative copy showing streets and lots with acreage surrounding Capitol Bldg. site, unidentified and undated. [rolled and creased]

Plastic envelope:

Negative reduced copy of portion of drawing #104 (above)

Photocopy of Development For State Capitol Grounds 20 June 1932

Photocopy of sketch of legislative chamber interior 6 March 1923

Photocopy of sketch of legislative chamber interior 12 March 1923

Negative photocopy of sketch of Senate chamber 15 May 1929

Negative photocopy of sketch of House 16 May 1929

Negative photocopy of sketch of Senate and House lobby 10 May 1929

Negative photocopy of sketch of rotunda 10 March 1923

Negative photocopy of sketch of ground floor entrance hall and rotunda 13 June 1927

Negative photocopy of sketch of lobby on first floor 25 April 1929

Negative photocopy of sketch of entrance hall ground floor 20 June 1929

Negative photocopy of sketch of section through entrance hall at end of east and west axis 24 June 1929

Negative photocopy of sketch of entrance hall ground floor elevator side 21 June 1929

Negative photocopy of sketch of corridors adjacent to rotunda ground floor 18 June 1929

Negative photocopy of sketch of carriage entrance n.d.

Negative photocopy of sketch of foyer or rotunda? N.d.

Negative photocopy of sketch of main entrance 24 May 1929

Envelope labeled Full Size Details 2051 to 2075; penciled note West Virginia State Capitol before Cass Gilbert died 1930 and before

Blueprint, Marblework Stairs No. 2, 3, 4, 5 Drawing #2051, 19 June 1930 (pencil on tracing paper)

Blueprint, Detail of Spiral at start of Stairs 2, 3, 4, 5, Drawing #2051-A, 2 February 1931 (rev. 17 February 1931) (pencil on paper)

Blueprint, W. 1 Railing Stairs 2, 3, 4, 5, Drawing #2052, 17 September 1930 (pencil on tracing paper)

Blueprint, Marble Details Foyers 119 and 121, Drawing #2053, 3 July 1930 (pencil on paper)

Blueprint, Interior Marble for Foyers and Main Rotunda, Drawing #2054 2 July 1930 (pencil on paper)

Blueprint, Ornamental Band Course Main Rotunda, Drawing #2055, 7 July 1930 (pencil on paper)

Blueprint, Marble & Plaster Details Entries to House & Senate, Drawing #2056, 10 July 1930 (pencil on paper)

Blueprint, Details of "K" and "N" Doors 1st Floor, Drawing #2057, 18 July 1930 (rev. 15 August 1930) (pencil on paper)

Blueprint, Marble Bench at Rostra, House and Senate, Drawing #2058, 12 November 1930 (pencil on tracing paper)

Blueprint, Scale and F. S. Details of Corner Stone, Drawing #2059, 23 July 1930 (pencil on tracing paper)

Blueprint, F. S. Detail of Sliding Doors "V" and "L" doors, #2060, 1 August 1930 (pencil on paper)

Blueprint, Marble Key Block Main Rotunda, Drawing #2061, 9 July 1930 (pencil on paper)

Blueprint, Senate and House Retiring Rooms Mantel and Scale Elevations, Drawing #2062, 20 August 1930 (pencil on tracing paper)

Blueprint, Senate and House Retiring Room, Plaster Cornice Wood Pilaster, Drawing #2063, 20 August 1930 (pencil on tracing paper)

Blueprint, Senate and House Retir'g Rooms Door and Window Details, Drawing #2064, 20 August 1930 (pencil on tracing paper)

Blueprint, Pres. and Speaker Recpn. Rm. & Private Office Wood Details, Drawing #2065, 27 August 1930 (pencil on tracing paper)

Blueprint, Senate and House Pres. and Speaker Recpn. Room and Private Office Plaster Corn., Drawing #2066, 27 August 1930 (pencil on tracing paper)

Blueprint, Detail of Door to Observation Platform, Drawing #2067, 5 September 1930 (pencil on tracing paper)

Blueprint, Details of Steel Elevator Doors, Drawing #2068, 2 September 1930 (pencil on tracing paper)

Blueprint, Details of K1 Doors House and Senate, Drawing #2069, 11 September 1930 (pencil on tracing paper)

Blueprint, Detail at Observation Platform Brackets and Rosettes, Drawing #2070, 5 September 1930 (pencil on tracing paper)

Blueprint, Detail of Lantern Level 298'3" to 313'7", Drawing #2071, 5 September 1930 (pencil on tracing paper)

Blueprint, Detail of Lantern 313'9" level to 319'3", Drawing #2072, 5 September 1930 (pencil on tracing paper)

Blueprint, Detail of Lantern Level 319'3" to 323'6", Drawing #2073, 5 September 1930 (pencil on tracing paper)

Blueprint, Detail of Flag Pole and Base, Drawing #2074, 5 September 1930 (pencil on tracing paper)

Blueprint, Grilles at Galleries House and Senate, Drawing #2075, 8 September 1930 (pencil on tracing paper)

Drawings/Blueprints - Building 3

Blueprint No. 32A8585, Westinghouse Electric Corporation, "Metal Cladswgr. - indoor Horiz. Drawout Type 50-DH-5- 23 March 1950. Additional description typed on back regarding electrical service stamped approved 11 July 1950

Blueprint No. 32A8587, Westinghouse Electric Corporation, "Metal Cladswgr. - indoor Horiz. Drawout Type 50-DH-5- 23 March 1950. Additional description typed on back regarding electrical service stamped approved 11 July 1950

Blueprint, "Precast Cement Treads with Non-Slip `Integro' Mats for Stairs No. 1 & 2" by Integro, Inc. for General Floor Company, 3 Jan. 1951

Blueprint, "Revisions to Ground Floor Plan Duct Distribution," Jaros, Baum & Bolles, 1 August 1950

Blueprint, "Elevator Entrance JambJ-20 by W.S. Tyler Company, Cleveland OH, 1 Dec. 1944 [but appears to have markings like other Bldg. 3 drawings.]

Blueprint, No. CA-1601, "Next Car Up" sign, 27 July 1950

Drawing No. X-3734, "Spec. Hot Water Coils 2 Row- 8 Tube Face, Aerofin Corporation, 31 Jan. 1950, for correction 31 May 1950. Attached to drawing are six smaller sheets relating to steam heat coils dated orig. 27 Nov. 1948 but stamped 8 May 1950

Drawing, No. 50CI-301-BJ, West Va. State Office Bldg. #3, "Two Stage Air Washer," Carrier Corp. 14 April 1950

Drawing, "Instructions for Mounting RO-894 Type A1" lighting fixture, 18 May 1950

Drawings, "Recessed Troffer," Type FF3, and others related to this style fixture, dated 24 Oct. 1950 and 15 Jan. 1951 [5 sheets]

Drawings for Hall P.B.Panel, #0-1794, dated 22 February 1950 and "as noted 26 Jan. 1951." Warner Elevator Co. Second copy has notations for installing

Drawings, Nos. 1 thru 5: "Stairs No. 1 and 2 - for West Virginia State Office Bldg No. 3 - Charleston W. Va." 8 March 1950, marked office copy and final

Drawing, Metal Cladswgr-Indoor Horiz. Drawout Type E. C. Ernst Inc. for West Virginia State Office Building #3 by Westinghouse, 29 March 1950

Drawings/Blueprints - Unknown for which building on complex

Sketch, pencil, of register grilles, West Virginia State Capitol, n.d.


Butterfield Collection


Archives Collections

West Virginia Archives and History